At first, the Jai Hind metro station was planned to generally be elevated. However, the AAI objected which the elevated extend up to your airport may possibly pose a threat to aircraft, And so the route was more reworked and the station was shifted underground, 150 m with the Airport https://railwaygroupdjobs58024.goabroadblog.com/31379833/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf