Over the planning on the Doing the job System and previous to the start from the drilling, an investigation should be carried out to guarantee the absence of any obstructions for the pile areas. Join a hopper to the top of tremie pipe. Following that, close the joint involving hopper https://fernandolsldp.blog-mall.com/33156596/the-5-second-trick-for-cast-in-situ-piles